Close
 Security code
Close

Breaking News with Geoman Subscription

 Security code
Close

Blog Newletter Subscription



 Security code

Central Park Flowrider Project

The Schneider Corporation landscape architecture department developed the design/construction documents for the Flowrider amenity at the Carmel Central Park Waterpark.



This project included the placement/layout of the Flowrider structure itself as well as the design for the surrounding hardscape/seating area with shade structures, surrounding landscape design, a mechanical building and two single-user restrooms with showers.



Construction for this project was completed in 2012 and it has been a highlight of the Carmel Central Park Waterpark ever since.